1. About average lead time for tooling

Our average lead time is 40 days, and it depends on how complicated the mold you order.

2. About our DFM capabilities

Yes, we do. The DFM will shows the parting lines,gate position, draft angle analysis & suggestions, wall thickness analysis & suggestions, part design suggestions for modification, slides & lifters, Texturing & engraving analysis, molding press type.

3. About the documented Biz Resumption Plan

we have a documented Biz Resumption Plan, in case there is a natural disaster, pandemic, or political unrest. And we can provide a copy for you.

4. About the documented Biz Resumption Plan

Yes, our manufacturing is based on your requirements.

1. About average lead time for tooling

Our average lead time is 40 days, and it depends on how complicated the mold you order.

2. About our DFM capabilities

Yes, we do. The DFM will shows the parting lines,gate position, draft angle analysis & suggestions, wall thickness analysis & suggestions, part design suggestions for modification, slides & lifters, Texturing & engraving analysis, molding press type.

3. About the documented Biz Resumption Plan

we have a documented Biz Resumption Plan, in case there is a natural disaster, pandemic, or political unrest. And we can provide a copy for you.

4. About the documented Biz Resumption Plan

Yes, our manufacturing is based on your requirements.